Steel frame of a future warehouse over a compacted ground pad, with a grader working nearby
Enclosed sandwich-panel building: waterproofing membrane laid over the prepared base with rebar mesh in place
A concrete mixer truck delivers concrete onto the reinforced base, with a laser level on a tripod nearby
The finished, trowel-polished warehouse floor with a mirror-like sheen reflecting light from the gate
  1. 01 Base
  2. 02 Reinforcement
  3. 03 Pouring
  4. 04 Finished floor

Installing industrial concrete floors

Design, pouring and finishing of floors built for maximum loads — for warehouse and production facilities across Western Ukraine.

Scroll

  • 15+ years Hands-on experience in industrial construction
  • 100+ Successfully completed turnkey projects
  • 100 000+ Of concrete floors poured and polished

Trusted by

  • Lasunka
  • Ternopil Meat Processing Plant
  • Agroland
  • APS
  • Zuph

Services

Full cycle: from ground compaction to project handover

We handle every stage — load calculations, joint layout, pouring, finish coating and documentation.

Pouring an industrial floor on a reinforced base

Industrial Concrete Floors

High-grade concrete, fiber or rebar reinforcement, laser leveling. A base built to carry racking and heavy equipment.

Learn more
A large warehouse complex with a trowel-finished, dust-free floor

Concrete Floors with Topping

Quartz and corundum hardeners, power-trowel finishing. The surface won't dust or crumble under load.

Learn more
Applying a polymer coating to a cold-room concrete floor

Polymer Floors

Epoxy, polyurethane and anti-static systems. Protects concrete from chemicals, moisture and abrasion, in any RAL color.

Learn more
Cutting an expansion joint with a diamond joint saw

Expansion Joint Cutting

Code-compliant joint layout, diamond cutting to 1/3 of slab depth, polyurethane sealing. No random cracking.

Learn more
Steel warehouse frame during sandwich-panel installation

Sandwich Panel Construction

Turnkey hangars, warehouses and workshops: frame, envelope, utilities and flooring. Spans up to 24–36 m without columns.

Learn more

How the Building Comes Together

The Floor Is a Structure, Not a Screed

The slab works together with the ground, the frame and the roof. That's why we design it for your specific equipment, racking and operating conditions.

  1. Ground BaseCompaction, gravel bedding, geotextile and waterproofing.
  2. Concrete SlabReinforcement, pouring, topping and expansion joint cutting.
  3. Steel FrameColumns and trusses spanning up to 24–36 m without intermediate supports.
  4. Roof and WallsSandwich panels with mineral wool or PIR core, doors, utilities.

Facility Type

Joint spacing 6×6 m — the standard for warehouses with racking and forklift traffic.

Process

Six Stages We Control Ourselves

No stage is subcontracted without engineer supervision — most floor defects happen exactly where stages meet.

  1. Site Survey

    Engineer site visit, measurements, assessment of soil and operating conditions: equipment, racking, humidity, temperature.

  2. Calculation and Joint Layout

    Slab thickness for axle loads, reinforcement type, joint layout accounting for columns and traffic paths.

  3. Base Preparation

    Ground compaction, gravel bedding, waterproofing. The base determines how long the slab will last.

  4. Reinforcement

    Steel mesh, steel or basalt fiber — separately or combined for maximum crack resistance.

  5. Pouring and Topping

    Concrete placement, laser leveling, vibrating-screed compaction, hardener application and power troweling.

  6. Finishing and Handover

    Expansion joint cutting, sealing, curing control, sign-off and warranty issuance.

Completed Projects

Projects We've Delivered

Warehouses, production facilities and cold-storage complexes in Ternopil, Uzhhorod, Chernivtsi, Lviv and Kyiv Oblast. Click to view the photo report.

About Us

Professional Installation of Concrete Floors and Structural Frames

Ol Bud Invest is a full-cycle construction company. We build commercial and industrial facilities turnkey, and our core specialty is industrial flooring — the foundation that determines the lifespan of any warehouse or production facility.

For over 5 years we've delivered the full construction cycle: from cast-in-place concrete and reinforced-concrete frames to sandwich-panel installation, concrete floors with topping and polyurethane-cement coatings. This means no gaps between contractors on site — defects usually happen exactly where different contractors' responsibilities meet.

We work exclusively in the western oblasts. This narrow geographic focus is a deliberate choice: it lets us fully control material logistics, respond quickly on site, and maintain continuous design and technical supervision.

  • 2021 Year founded. The owner personally oversees the process on every site.
  • 8 Oblasts of Western Ukraine — we only work where we can maintain quality.
  • 28 Days to full load capacity. Foot traffic is possible after just 3–5 days.
  • DBN Official contract, transparent estimate with no hidden costs, warranty on all work.

Trusted by

  • Lasunka
  • Ternopil Meat Processing Plant
  • Agroland
  • APS
  • Zuph

Coverage Area

Western Ukraine — And Nowhere Else

Eight oblasts, and not one further. This narrow geographic focus is deliberate: it keeps material logistics under control, lets us respond to inquiries quickly, and enables continuous on-site supervision.

Ternopil — company headquarters

FAQ

Answers to Common Questions

We work exclusively in the western regions of Ukraine: Volyn, Zakarpattia, Ivano-Frankivsk, Lviv, Rivne, Ternopil, Khmelnytskyi and Chernivtsi oblasts. This lets us respond quickly and keep quality control on every site.

Yes — installing industrial concrete and polyurethane-cement floors is our core specialty. We can carry out the work either on an existing building or as part of a complete construction project.

On average, work on a 1,000 m² site takes 2–3 weeks, including base preparation, pouring and joint cutting. However, full operational load is only allowed after 28 days, once the concrete reaches its design strength.

For warehouses with racking and material-handling equipment, the optimal slab thickness is 150–250 mm depending on axle load. Our engineers calculate the exact thickness for your equipment and traffic intensity.

Yes — we use antifreeze admixtures, temporary heated enclosures and mix heating. Winter pouring does add 10–15% to the budget, though, so where possible we recommend planning the work for the warm season.

The company was registered in March 2021. Since then we have successfully completed a number of warehouse construction and industrial flooring projects across the western region. Founder and director: Oleh Shchepankevych.

Free Estimate